Refurbishment
The holiday period is an intensive time at our shipyard. The UST 203 is currently undergoing a class overhaul. The vessel is 25 m long and 6 m wide. The exact scope of work will be determined after visual inspection of the vessel.
The holiday period is an intensive time at our shipyard. The UST 203 is currently undergoing a class overhaul. The vessel is 25 m long and 6 m wide. The exact scope of work will be determined after visual inspection of the vessel.